Skip to main content

Road, ramp closures begin for Capitol Crossing construction

WASHINGTON — Drivers should expect delays when traveling through the Third Street Tunnel the next two weekends as construction work begins on the multi-building Capitol Crossing development.

Construction will close the Second Street exit ramp from northbound Interstate 395 to Massachusetts Avenue NW, according to the District Department of Transportation.

The off-ramp will be closed from 7 a.m. Saturday, June 13 through 5 a.m. Monday, June 15 and again the following weekend from 7 a.m., Saturday, June 20 through 5 a.m. Monday, June 22.

Workers will be demolishing a retaining wall near the Second Street off-ramp — part of the prep work for the $1.3 billion development, which will be constructed over the interstate.

Drivers should expect heavy congestion and should consider alternate routes, DDOT says.

The D Street exit south of Second Street and the New York Avenue exit north of Second Street will remain open.

Starting this week, Massachusetts Avenue and H Street will be closed in both directions from 2nd Street to 4th Street as a high voltage power line is moved. The road closures will take place from 7 p.m. to midnight on Mondays and Tuesdays and on weekends from 8 a.m. until 6 p.m. Daytime lane closures are also possible during the week.

Drivers should expect the closures to last through July.

Coolest cars for summer: SUVs

While convertibles are the stars of summer, SUVs are the workhorses. Their tasks are endless, from trips to the beach to Home Depot or to socially-distanced gatherings. It’s hard to shake up the jam-packed SUV market, but Hyundai managed to do so with the Palisade, as an extreme value play. It seats up to eight, can be equipped with almost every luxury touch and competes with SUVs costing thousands (or tens of thousands) more.
Read Next Story